What to expect during your remodel, from the first call to the final walkthrough

Most of the stress in a remodel comes from not knowing what happens next. When is the dumpster coming? Why is nobody here today? What happens when they open the wall and find something bad?

This post walks through how a remodel goes with House Custom Carpentry, LLC, step by step. Every company runs a little differently. Even if you hire someone else, these are fair questions to ask before you sign. If you haven't picked a contractor yet, start with How to find a good contractor.

1. The first call

It starts with a phone call with me, Dylan. We'll talk big picture: what you want to change, why, when you're hoping to get it done, and roughly what you're planning to spend.

I know budget is an awkward subject. That's why we put Eastern NC planning ranges on our pricing page. Take a look before you call so we're starting from the same place. The ranges are ballparks, not bids. Your design, your selections and current market rates set the real number.

2. The site visit

Next, I come out to the house. I take measurements, look at access, check what's under the floor and behind the walls as far as I can, and tell you honestly what's feasible. If the plan in your head won't fit the budget or the structure, you'll hear that now, not after demo.

Bring to the visit: your photos, saved ideas or vision board (here's how to build one), and your real budget.

3. Design in 3D

Rough budget first, then a Design & Development Agreement if your project needs one. Every project starts with a free rough budget, so we can both see early whether it fits your goals and your investment range. For more involved projects, real numbers take professional drawings and a clearly defined scope, and producing those takes time and expertise. For those jobs we may recommend a Design & Development Agreement, typically around 5% of the estimated project cost, depending on design complexity, subcontractor coordination and any professional engineering required. You keep the drawings and the detailed scope whether or not you hire us to build, and if we do build it, the full fee is credited toward the construction contract. Not every project needs this step. I'll tell you up front if yours does. (More on our process page.)

We're a design/build firm, so design and construction stay under one roof. For kitchens, baths, additions and other jobs that need it, we draw the space in Chief Architect, using 3D models and walk-throughs, so you can see the room before we build it. We go through revisions together and lock in selections like cabinets, tile, fixtures and finishes.

This is the cheapest place in the whole project to change your mind. Moving a wall on a screen costs you a meeting. Moving it after drywall costs you real money.

4. The estimate and the lump-sum contract

Once the design and selections are firm enough to price, I write a detailed estimate and a lump-sum fixed-price contract. That's our go-to because homeowners sleep better knowing the number. (The full reasoning is in Construction contract types.)

Read the scope line by line. Our contract also covers a few things worth knowing ahead of time:

  • Workmanship standards. Work is judged by the NAHB Residential Construction Performance Guidelines, not by opinion.
  • Change orders. Significant changes to the scope go on a written change order, and you sign it before that work begins.
  • Unforeseen conditions. Remodeling means opening up an existing house. If we find concealed problems like hidden rot, mold, structural damage, insects or moisture in the crawlspace framing, and they materially change the scope, cost or schedule, we'll tell you. That extra work is billed on a cost-plus basis, as spelled out in your contract.
  • Materials price escalation. If major material costs jump significantly after signing because of market conditions outside our control, the contract allows the price to be adjusted by the actual increase. You get written notice first.

None of that is fine print meant to trap anybody. It's how both sides know where they stand when something comes up.

5. Payment milestones

We set the payment schedule before you sign, so nobody is guessing when an invoice shows up.

  • Larger jobs use a milestone schedule. A deposit covers materials (cabinets, windows and other special orders have to be bought before they show up), and the remaining payments are tied to stages of the work.
  • Small jobs may use simple 50/50 terms: half to start, half on completion.
  • Change orders are paid either up front or with the next scheduled payment.
  • Final payment is due at substantial completion, meaning when you can use the space for what it was built for, even if a few minor punch-list items are still open (more on that below).
  • You can pay by cash, check, ACH/bank transfer or credit card. Card payments carry the processor's actual fee, passed straight through (currently 3.4% via QuickBooks Payments). On some small jobs, I may choose to waive it at my discretion.

Contractors aren't banks, and homeowners shouldn't pay far ahead of the work. A milestone schedule protects both sides.

6. Permits and inspections

When the work needs a permit, we pull it and schedule the inspections. Inspections happen at set points, often before walls get closed up, so expect a pause or two while we wait on the inspector. That's normal, and it protects you.

7. Demo day

Demo is fast, loud and dusty, and it's when the house shows its secrets. Before we start, clear the work area of belongings, furniture and wall hangings. We're not responsible for items left in the space. Hang on to anything you want to keep, like old cabinets or a vanity mirror, and tell us before demo.

Once things are open, we'll know whether any of those unforeseen conditions showed up. If they did, you'll hear it from me directly.

8. Daily life during the job

This is the part people underestimate. Here's how it works with us:

  • Working hours are 8:00 a.m. to 5:00 p.m., Monday through Friday, excluding government holidays. We don't normally work evenings or weekends.
  • Who's in your house. We use a lead carpenter approach. I have a team, but I'm on site for most of every job, so you're not meeting a new crew every week. When we bring in licensed trade partners, they coordinate through me. Please route questions through me too, not directly to subs or vendors.
  • Access. Keep pathways clear and leave driveway space for work vehicles, plus a trailer on some jobs. For jobs longer than three working days, we'll ask for a key for a lockbox, so work can keep moving whether you're home or not. If you need to block out days, tell us in writing ahead of time.
  • Pets. Keep pets secured during work hours. Doors will be open and tools will be out.
  • Noise and dust. There will be some. We protect what we can, but it's a job site for a while. Plan for it, especially if you're losing a kitchen or your only full bath.
  • Communication. Email anytime. Please keep calls and texts to working hours unless it's a real emergency. You'll also have your own Job Board, our customer portal in Site View (our own construction-management platform), with progress photos, selections and your signed documents, available any time from the Customer login on our site.
  • Schedule. We make every reasonable effort to finish on time. Lead times on materials and work by other trades can shift dates, and when they do, we'll tell you the new window as soon as we know it.

9. Change orders

You'll probably change your mind about something. Most people do, and that's fine. "While you're here, can you also…" is how budgets fall apart when nobody writes it down. With us, a significant change goes on a written change order showing the work and the cost, and you sign it before the work starts. It's paid up front or with the next scheduled payment.

A change order isn't a penalty. It keeps the lump sum honest.

10. The punch list

Near the end, the big work is done and what's left is small stuff: a touch-up, a door that rubs, a missing pull. We walk the space together and write it down. Be specific about the spot, the problem and, if it helps, a photo.

Every remodeler will tell you the last few percent of a job feels the slowest. Some of it waits on a back-ordered part. We'll keep working the list until it's done.

11. Substantial completion and the final walkthrough

Substantial completion means you can use the space for its intended purpose, even if a few minor punch-list items remain. That's when final payment is due under our contract. It can't be held back for minor open items or for owner-furnished items you haven't picked yet. We still finish the punch list. That's our job and my name is on it.

During the final walkthrough, test things the way you'll use them. Run the water, flip every switch, open every door and drawer, and look at the finishes in good light.

Our workmanship warranty runs one year from the date of substantial completion, judged by the NAHB guidelines. If something comes up, call us first. Our contract gives us the first opportunity to fix it. More on what's covered is on our How we work page.

12. Reviews

When it's done and you're happy, I'd be grateful for an honest Google review. A local remodeler lives and dies on word of mouth, and reviews are how your neighbors find out who to trust. If something isn't right, call me before you write anything. I'd rather fix it.

Planning a kitchen or bath? See our kitchen remodeling and bathroom remodeling pages.

If you want help from us

House Custom Carpentry, LLC is a licensed NC design/build remodeler (NC# 82521) serving Goldsboro, Pikeville, Wayne County and Eastern NC. We do kitchens, baths, additions, decks and porches, and the repairs that keep a house solid. Call (919) 949-6846 or use our contact form.

— Dylan House